Faktori wholesale Lachin 2704 -37 Degre Jic Bulkhead Run Tee Materyèl Carbon Steel Idwolik Fittings

Deskripsyon kout:

Gwosè fil 1: Gason JIC 37

Gwosè fil 2: Gason JIC 37

Gwosè fil 3: Gason JIC 37

Spesifikasyon satisfè: SAE J514

Materyèl: Kabòn asye

Kouch: Cr3 Zenk plating, Zenk Nickle disponib

Fòm: Tee

2704 JIC yo ka ranplase ak anba a:
SAE 070958, Parker Hydraulics WJJTX, Parker 533T, Weatherhead C5726, Aeroquip FF1065

Disponib nan asye pur: SS-2704


Pwodwi detay

Tags pwodwi

Nou kenbe ranfòse ak pèfeksyone atik nou yo ak reparasyon.An menm tan an, nou jwenn travay la fè aktivman fè rechèch ak pwogrè pou faktori wholesale Lachin 2704 -37 Degre Jic Bulkhead Run Tee Materyèl Kabòn Steel idwolikFittings, Nou gen kounye a ki gen eksperyans enstalasyon fabrikasyon ak yon anpil plis pase 100 travayè.Se konsa, nou kapab garanti kout tan plon ak bon kalite asirans.
Nou kenbe ranfòse ak pèfeksyone atik nou yo ak reparasyon.An menm tan, nou jwenn travay la fè aktivman fè rechèch ak pwogrè pouLachin idwolik Fitting, Fitting, Pran konsèp debaz la nan "yo dwe responsab la".Nou pral retwouve sosyete a pou bon jan kalite pwodwi ak bon sèvis.Nou pral inisyativ patisipe nan konpetisyon entènasyonal yo dwe yon manifakti premye klas nan pwodwi sa a nan mond lan.

Pati No. Tib OD 1-3
Gason JIC
2
Bulkhead Gason JIC
I
Assm.
K
Epesè
M
Longè
M1
Longè
Ø W
Dyamèt
Y
Apatman
Fonksyone presyon
2704-03-03-03-4
2704-04-04-04-4
3/16
1/4
3/8 - 24
7/16 - 20
3/8 - 24
7/16 - 20
0.92
1.02
0.094
0.094
0.94
0.97
1.50
1.59
0.38
0.44
7/16
7/16
7,500
7,500
2704-06-06-06-4
2704-08-08-08-4
3/8
1/2
9/16 - 18
3/4 - 16
9/16 - 18
3/4 - 16
1.09
1.25
0.094
0.125
1.09
1.36
1.81
2.11
0.56
0.75
9/16
3/4
6,000
6,000
2704-10-10-10-4
2704-12-12-12-4
5/8
3/4
7/8 - 14
1 1/16 - 12
7/8 - 14
1 1/16 - 12
1.39
1.56
0.125
0.125
1.56
1.78
2.39
2.67
0.88
1.06
7/8
1 1/16
5,000
5,000
2704-16-16-16-4 1" 1 5/16 - 12 1 5/16 - 12 1.56 0.125 1.94 2.80 1.31 1 5/16 4,000

Nou kenbe ranfòse ak pèfeksyone atik nou yo ak reparasyon.An menm tan an, nou jwenn travay la fè aktivman fè rechèch ak pwogrè pou faktori wholesale Lachin 2704 -37 Degre Jic Bulkhead Run Tee Materyèl Carbon Steel Idwolik Fittings, Nou gen kounye a ki gen eksperyans enstalasyon fabrikasyon ak yon anpil plis pase 100 travayè.Se konsa, nou kapab garanti kout tan plon ak bon kalite asirans.
Faktori enLachin idwolik Fitting, Fitting, Pran konsèp debaz la nan "yo dwe responsab la".Nou pral retwouve sosyete a pou bon jan kalite pwodwi ak bon sèvis.Nou pral inisyativ patisipe nan konpetisyon entènasyonal yo dwe yon manifakti premye klas nan pwodwi sa a nan mond lan.


  • Previous:
  • Pwochen:

  • Ekri mesaj ou a isit la epi voye li ba nou